The adjuster's PDF did not read properly

What the parser's warnings each mean — a scan with no text in it, lines the carrier struck out, subtotals that disagree with what we read — and why every number on the finished quote is still yours to check.

The adjuster's PDF did not read properly

Open + Create → Insurance estimate, choose
the carrier's PDF, and read the notices before the numbers. The reader works on the text
inside the file
— a picture has no text — and the parser never guesses: where it
cannot be sure it flags the line, and nothing reaches a quote until you build one.

Nothing read at all

"No priced scope lines in that file" means exactly that — usually a scan or a photo,
since a picture of an estimate has no text. The claim header may parse while the lines do
not. Three steps:

  1. Open the PDF and drag across a line: if nothing selects, that page is an image.
  2. Ask the carrier for the digital original, or the text export from the program that
    wrote it (Symbility/Cotality).
  3. Come back and press Upload a different estimate.

Lines that arrived missing

  • "Struck through in the PDF — excluded. Check On to include." Carrier software
    strikes out lines it replaced; the parser keeps them switched off and says "N line(s)
    struck through in the PDF and excluded"
    . If the line is part of the job, tick
    Include.
  • A row you excluded yourself. The reconciliation counts included rows only:
    "Carrier RCV: $X · your included lines: $Y ✓ matches". When it says "differs, check
    the flagged section"
    , the cause is usually a row switched off — yours or the
    carrier's.
  • A line with no price. Flagged, counted in a material takeoff, and priced when you
    set your own figure.

Reading the confidence banner

What it says What it means
Read with our carrier estimate rules Layout recognised, every printed subtotal reconciles with the items above it, nothing flagged
This looks like <program> / We don't recognise the program that made this file Read with the general reader; the check is still the document's own arithmetic
This one needs your eyes A printed subtotal disagrees with the items above it, or more than one line in ten is flagged

When it adds "More than half the printed subtotals disagree with what we read", believe
it: the file is a poor scan or compressed copy and the text is garbled. Get a better
original.

Work the flags

The strip asks you to verify each line against the PDF. Two flags matter:

Flag What to do
Verify Qty A quantity was not readable. Type it against the PDF — the parser will not invent one
Set Price No price yet. Set it, or leave it: an unpriced line still counts in a material takeoff

✓ Looks right clears a row once checked. Press Build quote from this estimate with
flags remaining and Clavoz asks first: "N line(s) still flagged for review and M
struck-through line(s) excluded — build the quote anyway?"
— Build anyway or Keep
reviewing
.

When the file was never a scope

Sometimes the parse is fine and the document is the wrong one: a contractor proposal (already
marked up)
locks margin at 0%, so your markup is not charged twice; a supplement /
counter-quote package
holds two scopes; a supplement / reinspection claim adds to a
prior claim, not the whole job; a settlement statement of loss is the payments, not the
work; and an independent appraisal / public-adjuster estimate needs its tax and overhead
columns checked.

Still yours to check

The parser is a fast reader, not an authority, and Clavoz never sends anything on its own.
The Carrier Reconciliation export — overhead, profit, depreciation — is for the carrier
or adjuster, never a homeowner. Read
Your Responsibility for Quotes, and check every
flagged line against the PDF before the proposal leaves.

If a layout defeats the reader, send that file to hello@clavoz.com
(Getting Help); see also
Parsing Carrier Estimates.

Found something out of date? The guides live in the repository's docs/ directory — fixing the guide is part of fixing the feature.